About this deal
Wall chased out and cable placed in chase and protective UPVC pipe Step 3 – Install Fused Connection Unit (FCU) Zone 2 – the area beyond zones 0 and 1, 0.6m horizontally and up to 2.25m vertically. Zone 2 also includes any recessed window with a sill next to the bath and also around the wash basin
Once a suitable supply has been found the next task is to isolate the supply to the circuit you are using! If in any doubt, the power to the entire house is turned off.Ideally look for a model with double wound isolating transformer, integral overload protection and shutters on the plug inlets to prevent any accidental splashing. Once in place the cable was then tested to ensure there were no breaks etc. This is a necessary step as once the cable is filled over it’s a nightmare to have to dig it all out if it’s damaged.
In both cases, the cables are run down through the ceiling and down a chase cut into the wall to run to both locations All wires are then set into the wall and capped with protective sleeving and then all chases are filled, smoothed off and the either painted or tiled over. As we have mentioned above, when running down a wall to a power supply unit such as this the cable will need to run vertically down in a straight line to comply with regulations. Zone 1 – the area directly above zone 0, limited vertically to 2.25m above the bottom of the bath or shower, also 1.2m horizontally from the centre of a shower outlet to the height of the outlet, or 2.25m whichever is the higher Zone 0 – the interior of the bath or shower which can hold water. No appliances should be installed here period!
Best Shaver Socket Splitter Buying Guide In UK
However if you are installing in an upstairs then you may be able to locate a suitable supply in the loft. This is often the easiest route as everything should be much more accessible.
Using electrical equipment in bath or shower rooms has always needed great care to ensure safety due to the obvious risks of mixing water and electricity. The cable is then normally capped (covered with a protective UPVC capping) or run through some UPVC trunking/pipe to protect it and hold it in place. As previously mentioned, if you are sing a lighting circuit make sure it’s RCD protected. If it isn’t then you can’t use it. Once this is done, a minor works certificate is then issued to prove the installation has been carried out correctly. Once all the wires have been connected, the face plate is then screwed on to the pattress box, fixing it in place.If no supplies are this conveniently placed then it may be that you have to take up some floorboards in an above room and run your supply from here.